MCZ Star Guia de Instalação Página 12

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 75
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 11
min.3,5 metri
AT
(A)
AP
(B)
10
2-INSTALLATION
FOREWORD
This chapter on the Smoke Flue has been produced in reference to the prescriptions of European regulations (EN13384 - EN1443 - EN1856
- EN1457).
The chapter provides indications for installing an ecient and correct smoke ue but is under no circumstances to substitute the
regulations in force, which the qualied technician must be in possession of. Check with local authorities whether there are any restrictive
regulations in force regarding the intake of air for combustion, the smoke extraction system, the ue or the chimney.
The company declines all liability relating to the poor functioning of the boiler if this is due to the use of an insuciently sized ue in
violation of regulations in force.
SMOKE FLUE
The ue or chimney is of great importance for the proper operation of a solid fuel-burning heating appliance with natural draught, as
modern heating appliances have high eciency with cooler ue gasses and consequently less draught, it is therefore essential that the
ue is built up to standard and always kept in perfect working order. A ue that serves a pellet/wood fuelled appliance must be at least
category T400 (or greater if the appliance requires, and resistant to soot res. Smoke must be extracted through a single ue made of
insulated steel (A) or an existing ue that complies with the intended use (B).
A simple air shaft in cement must be suitably lined. In both solutions there must be an inspection cap (AT) and/or inspection hatch (AP)
- FIG.1.
It is prohibited to connect more than one wood/pellet or any other type of appliance (vent cowling...) to the same ue.
FIGURE 1 - SMOKE FLUE
Vista de página 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 74 75

Comentários a estes Manuais

Sem comentários